From: route@monster.com
Sent: Wednesday, August 10, 2016 8:09 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: Safety Coordinator
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
ROMMEL KHOSHABIAN 1287 Littman Drive, San Jose CA, 95120. Phone: (408) 242-9084 e-mail:
rommel.khoshabian@yahoo.com Summary:Dynamic,
results oriented, confident leader with over 20 years’ experience in managing
Semi-conductor Equipment. Skilled problem solver, with proven track record of
improving customer service, reducing cycle time, improving quality, and
reducing costs. Career Objective: Sustaining Equipment Engineering or Fab Equipment Management
position in R&D and/or Manufacturing Operations. Qualifications:JDSU
Inc. San Jose, CA
Manufacturing/Equipment
Manager
2008 – Present
Current Responsibilities: ·
Equipment manager for 200mm Optical Technology in
telecommunication Center at San Jose facility, supporting operation,
production line, and engineering development activity. ·
Managing and responsible for budgeting and forecasting
spare parts, consumable materials, and ongoing vendor expenses. Reducing
spending cost by 40% using 2nd source
spare parts, reducing FSE support cost by 70% by training technician and providing
supporting documentation. ·
Champion the transfer of 8-inch wafer Fab equipment from
Milpitas to San Jose, Managed contractor and work closely with EHS and
City/County, and 3rd party electrical team for all required certification and
final permits. Project completed and delivered on budges and on time. ·
Key contributor to a cross-functional team of process and
equipment engineering, facilities projects, and environmental health and
safety department. ·
Managing 4 shifts of line maintenance with 24/7 coverage,
supporting the operation with > 90% uptime on the entire fab equipment
tool set including, Novellus CVD, AMAT 5200 Oxide, DPS Metal Etch, AMAT PVD
Sputter, Watkins & Johnson , and oxide furnaces plus large line of
metrology equipment. Also managing following wafer fab equipment:
lithography (Canon stepper and SVG track), Verteq wet etch, Semitool, and
Gasonics Asher. ·
Tracked key metrics (Uptime, MTBF, MTBR, tool
qualification/defects, etc.) Experience: Applied Materials Inc. Sunnyvale, CA
Facility/Project
Manager
2007 – 2008
As a senior project manager, supported
Technology Center at Arques Campus for facilitating and installation of new
300-MM equipment tool set. Working directly with internal engineering team,
supporting the product development activity. Managed budget, construction
schedule, and coordination directly with facility team, environmental and
safety, City (for permit), electrical/mechanical trades and sub-contractors. Intel Corporation
Project Management
Santa Clara, CA
Facility Closure and Sr. Equipment Engineer.
2001 to 2006
Project
manager supporting Santa Clara and Folsom site facilities department with
multiple site operation and construction projects. Have lead 8 inch wafer
manufacturing Photonics Technology Operation fab startup as a senior member
of the equipment installation and tool qualification team, develop and
manufacture Intel’s first highly integrated optical networking planar devices
(PLC). Key Accomplishments
at Intel, Facility and Optical Group: ·
Supported direct day to-day sustaining activities and
strategic needs of the Site Facilities department. Responsible for the
facilities site incident prevention plan permit approval process, involving
major utility interruptions and impacts to buildings services during the
scheduled site shutdown. ·
As a site facility management representative, coordinate
and accomplished number of large construction projects at Santa Clara campus
including Data Center expansion project at Santa Clara-4 and 11 site, RNB,
SC-4 building refresh, and CHP3 site closure. ·
While a start-up, managed Fab equipment installation,
facility upgrades, process and equipment qualifications, vendor management
during purchasing equipment and installation. This project was on time and
ahead of schedule to meet product introduction. ·
Progressively increased responsibility. Focus area: Fab
equipment engineering management, operation cost analysis, vendor/supplier
management, facility, EHS, hiring and training key people to support ramp. ·
Managed NPI, equipment and operation CIP projects to meet
and improve the quality of our products and customer’s satisfaction. Directed
manufacturing operations recognized as the industry benchmark for lowest
manufacturing cost and highest product quality. ·
Key contributor to a cross-functional team of process and
equipment engineering, facilities, Reliability Lab including JDSU fiber optic
testers and Thermotron Environmental chamber. ·
Maintained > 85% uptime on the entire section tool set
(TEL Oxide Etcher, AMAT Endura Sputter, TCR Signatone, KLA Profilometer, and
March plasma chamber. ·
Recognized with an Intel Divisional Recognition Award for
resolving a critical tool install schedule roadblock to meet the original fab
startup timeline. ·
Engaged with Environmental Health Safety engineering,
implement and coordinate Air Quality District inspection for completing
permit process and requirements. Applied
Materials Thin Film- Application Lab Manager
Bowers BlvdField Service Engineer Santa Clara, Ca1993 to 2001 Key
Accomplishments at Applied Material
·
Managed group of five equipment Techs engineering to
perform and implementing engineering, R & D, and CIP continuous
improvement program) on 8 tools, including six Centura and two new 300mm
systems. Supported Demos / Marathons for customer locations worldwide. ·
Responsible for monitoring and providing lab usage data,
including tool utilization and down time on a total of 19 chambers. ·
Supervised and trained five FSE’s (Field Service Engineer)
and Intel equipment Techs. ·
Managed operation planning, budgeting, and resources on
new system start ups within the Santa Clara lab, including critical
integration and next generation product. ·
Provided forecasting and ordering for a large inventory of
200/300mm spare parts. ·
Interfaced with mechanical contractors, project consultants,
and AMAT facility personnel to complete projects efficiently, within the
budget and without compromising AMAT and OSHA safety standards. ·
Proficient and certified on Applied Materials Centura,
Endura, and P5000 platforms. Education & Additional Training: ·
Foothill
College - Los Altos, CA - Semiconductor certification ·
CTI Cryogenics, Robotics,
Vacuum, Plumbing and fitting
certified.
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|